Lucid Total · mocks v0.2

2026-10-28. An operating system, not a reporting system: the Horizon shows the few things that need you over a world that breathes beneath it; Talk is the shell; the world is a map at every depth, its places have landmarks and rings, its buildings show the products; decisions are forks with their consequences drawn. Every caption names its focal subject, its use cases and its attention counts.

Device · Phone shows the designed phone layout wherever a moment has one (frames 1, 2, 5, 6, 8, 12, 14 and 19, and the phone frames 34–37). The other frames stay desktop on purpose: the phone never shows a shrunk desktop (docs/13 §10).

A · Horizon and the world

Glance and Dive: the Horizon over a world that breathes beneath it, the company as places with landmarks and rings, perspectives, the zoom that reveals, the buildings that show the product, and the board as an instrument.

Partnerships
Engineering
Marketing
Operations
People
Support
System
Good morning, Yossi
Store submission: go or hold?
After the fixSee the paths
DDana: does the consent screen match?
It matchesComment
The coordinator needs the Railway token
Seal and sendTonight
Since yesterday14 buildings lit2 roads opened1 front grew over Compliance
Private beta
Gate 1 Alpha
Europe ready
9:41
Good morning, Yossi
The coordinator needs the Railway token
Seal and sendTonight
DDana: does the consent screen match?
It matchesComment
Store submission: go or hold?
After the fixSee the paths
and 2 more
Private beta
Gate 1 Alpha
Europe ready
Engineering
Marketing
Compliance
Product
Support

Device · Phone: the designed phone layout for this moment.

1 · Horizon, owner, morning. The glance home. Three needs-you cards, each with one visual and two replies: a fork (the Store stream cut-out with its front and the gate ring), Dana's feedback request (her screenshots as the facade), an envelope from the coordinator. The goals as three rings rising on the horizon line; one line since yesterday; the world breathing beneath in the lower 45 % at 60 %, seen at an angle: landmarks stand on the terrain in their rings, names only where legible, one heat halo and one front. Phone check at 390 px with the lab switch Device · Phone. Focal subject: the three cards that need Yossi.needs-you 3 · text 4 · numbers 4UC-A1UC-A5UC-Q8UC-C3UC-B3UC-H113§313§4
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
Store go/no-go
Europe first
N
D
O
Y
Legal counsel
Accounting
OwnerLegend
9:41
Engineering58 % · forecast week 25
Private beta
iOS 1.0
EU residency
Evals
Changed this week
iOSbuild 7 · TestFlight
WaitsRelease tests wait for the Railway tokenStore waits for the Hebrew fixEU residency waits for the DPA

Device · Phone: the designed phone layout for this moment (from frame 35).

2 · The company world, owner. Eleven domains as places with landmarks, names and rings (forecast tick outside), light by progress, sub-places as faint contours; heat over Engineering; a risk front over Compliance with its reason as on hover; two material forks as banners; presence with status rings (agents in the Lucid hue); two embassies at the coast; System as an island beside the coast (docs/14 §2.1). Legend chip closed, perspective chip "Owner". Focal subject: the company as one world.needs-you 2 · text 6 · numbers 0UC-A1UC-A3UC-A6UC-Q2UC-P213§503§3–4
Compliance
Engineering
Product
Design
Partnerships
Support
Leadership
Marketing
Talk clearly,in every language
Bonjour,Lucid
O
Europe launch continues
Marketing
3 · The same world, CMO perspective. Omer's perspective: Marketing centred and large, its harbour as the emblem, three campaign facades as its skyline (the France teaser still a ghost); the Europe launch hull crossing into Compliance and Engineering with "continues"; the other places ambient at the edge, nothing hidden. The Market aspect docked at the end edge: two charts, each headed by its finding, the value above the trend. Focal subject: Marketing and its campaigns.needs-you 0 · text 7 · numbers 6UC-E1UC-A3UC-Q513§5.503§5
Company
Private beta
Engineering
iOSbuild 7 · TestFlight
Private beta
Engineering lit; the rest fades in placeIts contour becomes the frame; programs appearStreams become districts; facades appear
4 · Zoom reveal. Three stills of one continuous zoom, the same place in the same hue: the company with Engineering lit and the rest faded in place; Engineering's own contour becomes the frame, its skyline moves to the corner as emblem, its programs appear; Private beta's streams become districts and their facades appear (one still a ghost). Focal subject: Engineering through three depths.needs-you 0 · text 3 · numbers 0UC-A2UC-Q213§5.203§4
Private beta
iOSbuild 7 · TestFlight
iOS 1.0
iOSbuild 6 · review
EU residency
Evals
Platform
Integration suite flaky
N
Continues into Compliance · Marketing
CTO
9:41
Engineering58 % · forecast week 25
Private beta
iOS 1.0
EU residency
Evals
Changed this week
iOSbuild 7 · TestFlight
WaitsRelease tests wait for the Railway tokenStore waits for the Hebrew fixEU residency waits for the DPA

Device · Phone: the designed phone layout for this moment (from frame 35).

5 · Engineering, CTO perspective. Programs as places with landmarks and rings; a skyline of recent facades under each; the EU residency program inside the Europe hull, which continues into Compliance and Marketing; a front over Private beta (integration suite flaky); heat where things moved; Noa and two agents present; the Delivery aspect docked: proposed → in progress → done over eight weeks with the forecast band, its finding first. Focal subject: Private beta, the largest program.needs-you 0 · text 8 · numbers 4UC-A2UC-A3UC-Q5UC-E113§513§8.6
iOSbuild 7 · TestFlight
Dispatcher
Relay
Evals
Store
Gate 1 Alpha
Integration suite flaky
As a board
9:41
Engineering58 % · forecast week 25
Private beta
iOS 1.0
EU residency
Evals
Changed this week
iOSbuild 7 · TestFlight
WaitsRelease tests wait for the Railway tokenStore waits for the Hebrew fixEU residency waits for the DPA

Device · Phone: the designed phone layout for this moment (from frame 35).

6 · Private beta · Wave 71. Streams as districts. Buildings show their products: four built (a latency chart, Relay screens, an eval report cover, the iOS build badge) with criteria rings; three ghosts (expected facades, dashed); two small kind buildings (the Railway token chore, the go/no-go decision with its flag); two finished landmarks (green edge). The critical road runs to the Gate 1 Alpha gate; the chore's road to the release-path tests is broken by a barrier; a front over Dispatcher; one hovered building with its title and ring caption. Focal subject: the critical road to Gate 1 Alpha.needs-you 0 · text 5 · numbers 5UC-A4UC-A7UC-B4UC-Q313§5.303§4
iOSbuild 7 · TestFlight
Dispatcher
Relay
Evals
Store
Gate 1 Alpha
Integration suite flaky
Back to the worldWave 71 as a boardCardsLines
Proposed
Relay approve-first screen
Store listing screenshots
Store submission go/no-go
Ready
Fail-closed release path tests
Doing
Dispatcher sequencing under load
Put the Railway staging token in an envelope
Review
Relay originals: sender-only key wrap
Prompt v12 eval candidates
iOSbuild 7 · TestFlightiOS build 7 on TestFlight
Done
Outbox fan-out with idempotency keys
EVAL-DB v2
7 · The board as an instrument. Opened from "As a board" over the same place: a translucent sheet with the five states, each card led by its facade thumbnail; Cards · Lines toggle; "Back to the world". The world stays visible, dimmed, beneath. This is the only kanban in the gallery. Focal subject: the board sheet.needs-you 0 · text 1 · numbers 5UC-B1UC-B513§903§10

B · Products

The item is a product view: the product large and first, expected beside actual, the goal and the done rule in one line each, criteria as a ring, the talk, the roads, and the implications first when done.

iOSbuild 7 · TestFlight
Dispatcher
Relay
Evals
Store
Gate 1 Alpha
Integration suite flaky
Consent screen with the EU data notice
Expected · the mockActual · Dana's screenshot
Goal EU users see what we keep and why, before their first message.
Done when it matches the mock in English and Hebrew, links the DPA, legal approves the wording, the walkthrough is published.
Europe readySpawned by L489DDanaDoingSince Oct 26
4 of 6
criteria met
Hebrew matches the mock: partlyThe Continue button wraps to two lines at 390 px.Screenshot 2 · checked by the evidence agent
DDanaThe button wraps in Hebrew; see the right half.
OOmerA shorter label fits. I'm fixing the copy.
LucidI drafted the walkthrough from Dana's screenshots, both directions.ApplyOpen draft
Waits on Omer's copyStore submission waits
9:41
Consent screen, EU notice
MockDana
EU users see what we keep and why.
Matches the mock in both languages; legal approves.
4/6The Continue button wraps in Hebrew.

Device · Phone: the designed phone layout for this moment (from frame 36).

8 · Product view: a screen. Dana's item opened over the dimmed world. The product first and large: the mock (expected) and her screenshot (actual) under a slider at 50 %, the difference marked; the goal and the done rule in one line each; the criteria ring (4 met, 1 partly, 1 open) with the partly segment's evidence open; the context strip; the talk with the assistant's drafted walkthrough and "Apply"; the roads: one wait upstream, the Store submission downstream on the critical road. Focal subject: the screen, expected against actual.needs-you 0 · text 4 · numbers 7UC-B1UC-B2UC-B3UC-A7UC-Q313§6
iOSbuild 7 · TestFlight
Dispatcher
Relay
Evals
Store
Gate 1 Alpha
Integration suite flaky
Dispatcher sequencing under load
Latency stays under budget until 740 messages a second
Expected · the budgetActual · measured todayOver budget
100200300400Crosses the budget at 740/s+52 ms at 800/s0 messages a second1,000ms
Done when p95 stays under 300 ms up to 800 messages a second, in all six languages.
Private betaNNoaWorker BDoing
4 of 6
criteria met
Ordered under loadIdempotent replaysLatency at 800/sSix-language run
Above 740/s Hebrew and Arabic miss the tokenizer cache, which costs about 50 ms. Warming the cache per language should close it.Propose the fixSee the data
78 % confidence in the diagnosis
9 · Product view: an analysis. An analysis item: the expected curve (the latency budget, dashed) and the measured curve overlaid, the difference shaded where it is over budget, two difference marks; the chart is headed by its finding; the done rule; the criteria ring with its four named segments; the assistant's diagnosis with its published confidence and "Propose the fix". Focal subject: the measured curve against the budget.needs-you 0 · text 4 · numbers 20UC-B2UC-A7UC-Q313§6
iOSbuild 7 · TestFlight
Dispatcher
Relay
Evals
Store
Gate 1 Alpha
Integration suite flaky
Done: what it changed
+9 % road opened
Dates that moved
Nov 21Nov 14Gate 1 Alpha
Nov 10Nov 5Store submission
ToldYNOD
Lesson Wrap keys at send time, not at delivery: the late wrap cost two days.
Relay originals: sender-only key wrapAll criteria met · Worker C · reviewed by Noa · today
10 · Product view, done: implications first. A done item opens on what it changed: the ripple on a cut-out of the wave (three buildings unblocked, a road opened, the Gate 1 Alpha ring advanced 9 %), the dates that moved, the five who were told, the lesson; the product and its met criteria below. Focal subject: the ripple of a finished item.needs-you 0 · text 2 · numbers 7UC-Q4UC-B1UC-G113§6
iOSbuild 7 · TestFlight
Dispatcher
Relay
Evals
Store
Gate 1 Alpha
Integration suite flaky
Open the Apple developer account
Expected · the steps3 of 5
steps done
Actual · the account
Goal Lucid can ship to the App Store under its own name.
Done when the account is active and Noa and the coordinator can sign builds.
iOS 1.0YYossiWaiting on Apple
D-U-N-S numberLegal entity verifiedEnrolled and paidReview by AppleInvite Noa and the coordinator
Apple
Reviewing the enrolment · usually two days
The account password
Sealed for Noa · opens once, in the app
Seal it
11 · Product view: a chore. A chore without a screen still has a product: expected as a checklist ring (3 of 5 steps), actual as the account badge, side by side; the party (Apple) as an embassy marker with what we wait for; the envelope step for the password, sealed for Noa. Focal subject: the checklist ring against the account.needs-you 0 · text 4 · numbers 4UC-B5UC-H1UC-P213§6

C · Decisions

Decide mode: a decision is a fork with its consequences drawn and a published confidence per path; strategy as futures with haze; Refocus as effort moved over the world with the transparency strip; the small change; an ask as a small fork.

Cost: $0 · Toil: 2 h of NoaStore submission: go or hold?Build 7 passes everything except the Hebrew consent screen, where a button wraps. Apple has rejected right-to-left layout faults twice before.
Fri 18:00Fork 1 of 1
iOSbuild 7 · TestFlight
Hebrew screen wraps
NNoa
driver
YYossi
approver
ODOmer, Dana
contributors
Beta testers
informed
Submit now
After the Hebrew fix
Hold a week
Submit now
Nov 3No extra work
Review may reject the Hebrew screen55 % confidence
After the Hebrew fix
Nov 3Nov 5ONOmer 1 h · Noa 2 h
82 % confidence
Hold a week
Nov 3Nov 10The beta slips a week
90 % confidence
Tap a path to choose · ask · delegate · later
9:41
Cost: $0 · Toil: 2 h of NoaStore submission: go or hold?Build 7 passes everything but the Hebrew consent screen.
iOSbuild 7 · TestFlight
Hebrew screen wraps
After the Hebrew fix
Nov 3Nov 5
Omer 1 h · Noa 2 h82 % confidence
Submit now
Nov 3
Review may reject it55 % confidence
Hold to choose

Device · Phone: the designed phone layout for this moment (from frame 36).

12 · The Fork. One decision, composed as a fork. Cost and toil first; the question; two sentences; one visual (the Store stream with its front and the gate ring) as the origin of three paths. Each path ends in its consequence drawn: the beta ring with its forecast range, the date on the road, who is loaded, the risk, and a published confidence. The recommended path is lit. Reversible until Friday 18:00. DACI: Noa drives, Yossi approves, Omer and Dana contribute, the testers are informed. Choose by tapping a path. Focal subject: the lit path and its consequence.needs-you 1 · text 4 · numbers 16UC-R1UC-C313§7.1
Cost: $1,200 a month moves · Toil: noneWhich market first?Three futures one month out, drawn from today's plan. Haze is what the forecast does not know.
NNoa
driver
YYossi
approver
ODOmer, Dana
contributors
Beta testers
informed
Europe first74 % confidence
Compliance clears the DPA and the EU waitlist converts; the US waits five weeks.
US first61 % confidence
Partnerships move first; the Europe front grows and the waitlist cools.
Both at once42 % confidence
Everything moves a little; two people are over capacity by week three.
Tap a future to choose it, or open it in Refocus
13 · Futures. A strategic decision as three small worlds one month out: rings, heat and fronts differ; haze thickens as confidence falls; one sentence under each; the recommended future lit. Focal subject: Europe first, the lit future.needs-you 1 · text 4 · numbers 4UC-R3UC-C113§7.1
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
Nov 20Dec 4Nov 30 – Dec 9
Dec 15Dec 1Nov 27 – Dec 6
Europe raised
23 items gain priority3 dates move2 people over capacity$1,200 a month shiftsMarketing waits 2 more weeks for iOS 1.0
ApplySave as a futureDiscard
Refocus · EuropeCapacity 4 workers · velocity last 6 weeks
9:41
Refocus · Europe
ComplianceDec 15 → Dec 1
Engineeringweek 25 → 25
MarketingNov 20 → Dec 4
Productno change
23 items gain priority2 people over capacityMarketing waits 2 more weeks

Device · Phone: the designed phone layout for this moment (from frame 37).

14 · Refocus. Effort moved toward Europe: a slider on each place (the faint mark on each track is the base plan), the Europe hull raised; the rings show a fan (the forecast range, in the Lucid hue) with the base-plan tick kept; ghosts where work moves; two dates sliding on their roads with their ranges; the transparency strip; Apply · Save as a future · Discard; the assumptions chip. Focal subject: Compliance, where effort flows.needs-you 0 · text 6 · numbers 16UC-R2UC-K313§7.2
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
Store listing screenshots
Done when six screenshots in English and Hebrew pass review.
Due
Nov 6
iOS launch campaignOmer · starts Nov 9
Marketing's campaign waits 3 more days · nothing breachesConfirmUndo
15 · A small change. Inside a product view the due date is dragged from Nov 3 to Nov 6 (the old date a dashed ghost); one line appears with the consequence, and confirm or undo sit in the same line. Focal subject: the dragged date and its one-line strip.needs-you 1 · text 2 · numbers 10UC-R513§7.2
Partnerships
Engineering
Marketing
Operations
People
Support
System
Good afternoon, Noa
Four testers hit the same billing screen fault. What now?
Turn into a taskNo actionNeeds more
Raised by the triage agent from four issues · the testers see “With Noa, deciding”
And 1 more
16 · An ask as a small fork. Noa's Horizon: four testers' screenshots as the facade strip, three replies (the recommended one marked with the Lucid mark), and the asker's state beneath so the loop stays visible. Focal subject: the ask and its three replies.needs-you 1 · text 2 · numbers 1UC-N1UC-N2UC-F113§12

D · Meetings and daily use

Meet mode and the quick moments: the Table where spoken decisions land on the world, minutes that nobody writes, a status composed from one question, and a scene re-composed on request.

iOSbuild 7 · TestFlight
Dispatcher
Relay
Evals
Store
Gate 1 Alpha
Integration suite flaky
Where we areRelay in beta?Store go or holdEurope consentNext steps
Relay in beta
Store go/no-go
Europe consent
Captured from Noa · confirmed by a nodRelay ships in betaTwo buildings move to Ready · a road opens
Undofor an hour
Cohen Legal
attending · sees Europe consent only
Europe consent
YNODNoa speaking
34 min left
17 · The Table: "Beta readiness". Meet mode. The subject centred (Wave 71 of the beta); the agenda as a path with the current step lit; three open forks as banners; the captured decision "Relay ships in beta" landing on the world (two buildings lit as they move to Ready, the Relay road opened) with Undo for an hour; attendees as presence, the speaker marked; Cohen Legal attending, with the compartment veil over all but the consent item. Focal subject: the captured decision landing on the world.needs-you 0 · text 6 · numbers 2UC-R4UC-C6UC-P113§4
Beta readiness · what we decidedToday, 11:00 to 11:52 · five attendees and Cohen Legal for one item
Relay ships in betaTwo buildings moved to Ready; the Relay road opened.
Submit after the Hebrew fixThe store date moved to Nov 5; Gate 1 Alpha stays on track.
Consent text goes to Cohen LegalDana sends the wording today; the DPA road waits on them.
Asks raisedOmer asks Design for store art by FridayNoa asks Finance about a second Mac runner
Risk addedThe DPA may not be signed before Dec 1
Next
Hebrew fixSubmit build 7Apple reviewGate 1 Alpha
Sent to the attendees · Lucid Chat for Yossi and Noa · email for Cohen Legal, the consent item only
18 · Minutes as a scene. After the meeting: three decisions as cards with their ripples, two asks raised, one risk added, the next steps as a path, and to whom it was sent and how (the party gets its compartment only). Focal subject: the three decisions.needs-you 0 · text 4 · numbers 7UC-R4UC-C6UC-G113§12
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
Back to the HorizonComposed for Yossi · from 64 items, read 10:42
Private beta
forecast: week 25, one week late
The beta slips a week unless the Railway token lands today.
Release-path tests
wait for the Railway staging token
Open the envelope task
Store submission
waits for the Hebrew button fix
O
Changed this week
iOSbuild 7 · TestFlight
The integration suite is flaky
9:41
where are we on the beta?
The beta slips a week unless the Railway token lands today.
Release tests wait for the tokenStore waits for the Hebrew fixOpen the envelope task
Listening · release to send

Device · Phone: the designed phone layout for this moment (from frame 37).

19 · Quick status. "Where are we on the beta?" in Talk becomes a composed scene: the beta ring with its forecast, the two blocked roads with their reasons, the three facades that changed this week, the one front, and the one sentence that matters; a back chip; provenance in one line. Focal subject: the sentence and the beta ring.needs-you 0 · text 2 · numbers 3UC-Q1UC-A4UC-T413§12
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
BackPrivate beta · the moneySimplerAs a timelineWho
Beta spend is flat at about $310 a week
$318this week
wk 39: $290wk 40: $305wk 41: $320wk 42: $300wk 43: $296wk 44: $330wk 45: $312wk 46: $3188 weeks agothis week
Most AI spend is the strongest class, on diagnosis
DiagnosisDiagnosis, fast: $4Diagnosis, standard: $10Diagnosis, strongest: $46$60BriefingsBriefings, fast: $6Briefings, standard: $22Briefings, strongest: $4$32TriageTriage, fast: $12Triage, standard: $6$18
faststandardstrongest
What it costs the runway
0.3 monthsof 14
At this pace the beta uses a third of a month of runway before Gate 1 Alpha.
Used: Railway invoices to Oct 27, model spend by class, the beta's 64 items. Left out: salaries (restricted).
20 · Re-composing. "Just the money" re-composes the same place as its Money aspect: weekly spend (finding first, current value above), AI cost by task and class, the runway effect; chips to re-compose again; the AI's note of what it used and what it left out. Focal subject: the beta's money.needs-you 0 · text 6 · numbers 11UC-Q1UC-Q513§8.3

E · Aspects and infographics

Dashboards that are places to think: quiet, trend and shape first, the finding as the headline of every chart, one tap into the places behind a number; infographics as one story on one screen.

Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
DeliveryOwner
Engineering
Product
Design
Marketing
Compliance
Support
Each place
The beta lands a week after its target
58 %Private beta
Forecast rangewk 24Sep
Gate 1 Alpha is on time
81 %Gate 1 Alpha
Forecast rangeNov 14Sep
Europe waits on one signature
34 %Europe ready
Forecast rangewk 30Sep
Open work is shrinking for the third week
131done · 14 this week
Proposed: 58 this weekIn progress: 23 this weekDone: 131 so farForecast for done: 140 to 178 items over the next three weeks 8 weeks agotodayforecast
ProposedIn progressDone
The 23 open itemsWhat is blockedEvery number opens the places and buildings behind it; back is one tap.
21 · Delivery aspect. Delivery as a place to think: a ring per place; the three goals as small multiples, each headed by its finding, the value above the trend, the forecast range and the target marked; the flow of open work to done with its forecast; one drill chip per metric; no table. Focal subject: the three goals' forecasts.needs-you 0 · text 9 · numbers 12UC-Q5UC-A513§8.6
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
MoneyFounders
Runway reaches December 2027 at today’s spend
14 monthsof runway
Dec 2027May
Spend decisions comingMac runnerA second Mac runner · $90 a month · Noa asksFable onFable for diagnosis · about $140 a month
Engineering is almost half the spend
Engineering 46 %System 14 %Marketing 12 %Product 9 %Compliance 8 %Operations 6 %Support 5 %
AI cost holds near $110 a week
5 weeks ago5 weeks ago, fast: $145 weeks ago, standard: $305 weeks ago, strongest: $52$964 weeks ago4 weeks ago, fast: $164 weeks ago, standard: $344 weeks ago, strongest: $60$1103 weeks ago3 weeks ago, fast: $153 weeks ago, standard: $313 weeks ago, strongest: $58$1042 weeks ago2 weeks ago, fast: $182 weeks ago, standard: $362 weeks ago, strongest: $66$120this weekthis week, fast: $17this week, standard: $35this week, strongest: $58$110
faststandardstrongest
22 · Money aspect (founders). Runway as a line with the month it ends marked; spend by place as one strip with each place's landmark; AI cost per week by model class; two spend forks coming as banners. Focal subject: the runway line.needs-you 0 · text 5 · numbers 22UC-Q5UC-O113§8.6
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
PeopleOwner
Noa is over her week; everyone else has room.
N
NoaCarries more than her week: two reviews could go to Worker C.
D
DanaRoom for the consent fix this week.
O
OmerRoom to take the store art.
Y
YossiFull; three decisions are his.
Waiting, both ways
DDana waits on Cohen Legal for the DPA · 8 days
ONOmer waits on Noa for build 7 · 2 days
YThe coordinator waits on Yossi for the token · today
Time off, next four weeks
D
N
Today on the left; four weeks to the right.
Asks waiting for an answer
N
Y
D
23 · People aspect. Load as gauges per person, worded as help; waiting-on both ways as short roads (amber only for the overdue one); time off as a band; asks waiting per person as dots. Focal subject: Noa's load and the help offered.needs-you 0 · text 2 · numbers 3UC-E4UC-E7UC-Q513§8.6
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
CustomersSupport
Lucid Chat brings two thirds of the issues; most are resolved in triage
Lucid Chat: 34 issuesEmail: 12 issuesStore reviews: 6 issuesResolved: 31Became tasks: 14No action: 7TriageLucid Chat · 34Email · 12Store reviews · 6Resolved · 31Became tasks · 14No action · 7
Promises kept
94 %First reply under 4 h
78 %Resolved in 3 days
What testers ask for most
Billing screen fault
Hebrew keyboard in Relay
Export a conversation
Beta users by market
Israel 128Germany 46France 22
24 · Customers aspect. Issues intake as a flow from channels through triage to outcomes, its finding first; promises kept as rings; what testers ask for most; beta users by market as a small strip. Focal subject: the intake flow.needs-you 0 · text 4 · numbers 13UC-F1UC-F5UC-Q513§8.6
The quarter so farThe beta is close; Europe waits on one signature.
Private betaA week late, closing
Gate 1 AlphaOn time
Europe readyWaits on the DPA
The DPA with Cohen Legal is the one risk front.
Fourteen months of runway
MayDec 2027
Five decisions made the quarter
Beta firstRelay shipsStore after fixConsent textFable later
Shared with Board · compartment: goals and forecasts · re-rendered from live data when opened
Share with the board
25 · Infographic: the quarter for the board. One story on one screen: a title line, three goal rings, the Europe front, the runway line, five decisions as a path, one sentence each; shared within the board compartment. Focal subject: the quarter's headline.needs-you 0 · text 4 · numbers 2UC-Q6UC-P113§8.5
InfographicsStories told on one screen, for the places you can see. Each re-renders from live data when opened.
The quarter for the board
Oct 28 · Board
Private beta for the testers
Oct 21 · Testers
Europe launch: where it stands
Oct 18 · Owner
Relay: what changed
Oct 15 · Team
Support this month
Oct 10 · Support
The System, repaired
Oct 7 · Owner
26 · Infographics view. The infographics that exist for the viewer's places as six thumbnails with subject, date and audience; a new one asked for in a sentence in Talk. Focal subject: the request in Talk.needs-you 0 · text 1 · numbers 6UC-Q6UC-Q713§8.5

F · The system

Lucid Total runs itself: its subsystems as a place, repairs as visible loops with evidence, AI processes as quiet cards with four states, models as classes and decisions, autonomy as a trust layer on the world.

api
ai
channels
worker
scene
knowledge
connectors
data
importer
RTL render fault
27 · The System place. Lucid Total as its own first tenant: its subsystems as sub-places with landmarks and health rings; a front over scene (the RTL render fault); the open repair as a lit building with the repair agent present; cost today as one ring; what is being built for the System. Focal subject: scene, with its front and the repair.needs-you 0 · text 10 · numbers 2UC-S1UC-S214§2
Repairing: RTL render fault in the scene renderer
DetectDiagnoseProposeBuildVerifyDeployConfirm
Claude Code session · worktree rtl-fix
Running the RTL walkthrough in Chromium and WebKit
Evidence so far
Tests 212 / 212Validator passedWalkthrough running
Autonomy: informThis repair class deploys and tells you after; it rolls back if the monitor that found the fault fires again.
On your Horizon when it is done: “System repaired itself: RTL rendering, 40 minutes, no data touched.”
28 · A repair in progress. The repair loop as a path with Verify lit; the Claude Code session as a building showing the change, with its working line; evidence as artefacts to review (tests, the validator, the RTL screenshots), not a log; the autonomy chip; the one line that will reach the Horizon. Focal subject: the session and its evidence.needs-you 0 · text 1 · numbers 3UC-S3UC-B614§4
AI processes
$31Budget used today
$31 of $60
94Runs validated first time
94 %
Coordinator
playbook · agent
strongest
Gate 1 Alpha
3 h$4.10assigned P1-C-06
Worker B
build · agent
code
P1-C-03 · Dispatcher under load
ProduceValidateConfirm
52 min$2.80ran the load test
Worker C
build · agent
code
P1-C-06 · Relay approve-first
20 min$0.90waits for Noa
Triage agent
triage · agent
fast
Support intake
idle 1 h$0.30filed ASK-017
Evidence agent
validator · agent
vision
Walkthrough of the RTL fix
6 min$0.60checked 4 screenshots
Importer
import · agent
local
Accounting export
2 h$0stopped
Stopped: the export changed shapeRetry
29 · AI processes. The process table as quiet cards: each agent says it is an agent and has one of four states (working, waiting, idle, stopped), its model class, owner item, age, cost today and last change; one stopped process with its barrier and a retry; the validation steps as a short path on one card; totals as two rings. Focal subject: the stopped importer.needs-you 0 · text 1 · numbers 26UC-S5UC-D314§6.1
ModelsClasses, not model names: what each is good at, how fast, what it costs, what data may reach it.
Fast
Sorting, routing, short triage.
0.4 s typical
$0.002a typical task Zero data retention Used for: classify, triageOn since Oct 2
Standard
Briefings and composing scenes.
1.8 s
$0.03a typical task Zero data retention Used for: briefings, scenesOn since Oct 2
Strongest
Diagnosis, change sets, code.
6 s
$0.42a typical task Zero data retention Used for: diagnosis, buildsOn since Oct 2
Fable
The hardest reasoning and core code.
14 s
$1.10a typical task Kept 30 days by the provider Used for: nothing yet
About $140 a month at today’s use · moves diagnosis and change sets here
EnableContext
30 · Settings → Models. One card per class: what it is good at, speed, cost per typical task, data terms, the data classes allowed as glyphs, default uses. Fable is a decision card: enabling it opens the decision with its monthly cost and the routes that would change. No model id appears. Focal subject: the Fable decision card.needs-you 1 · text 5 · numbers 13UC-S614§7.3
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
run
inform
confirm
confirm
confirm
suggest
suggest
suggest
suggest
suggest
observe
observe
Support × triage → inform92 % accepted unchanged over 400 runs; 3 % undone. It would stop asking for about 60 triage replies a month and tell you after.
PreviewConfirm
observesuggestconfirminformrun
Trust layer
31 · Trust map. A layer over the world: each place tinted by how far the system runs it (observe · suggest · confirm · inform · run, glyph and word on each), the legend; one advancement proposal (Support × triage → inform) with its figures, Preview and Confirm. Focal subject: the Support advancement proposal.needs-you 1 · text 6 · numbers 4UC-S7UC-L214§8.3

G · Channels

The system where people already are: a verified contact in Lucid Chat, decisions by email reply, a quiet member of Slack channels.

Lucid Total verified · key 7F3A 21C9
Today 07:30
Good morning. 14 buildings lit, 2 roads opened, 1 front grew over Compliance. Two things need you.
Your morning
Tap to open the Horizon
Cost: $0 · Toil: 2 h of NoaStore submission: go or hold?Build 7 passes everything but the Hebrew consent screen. Recommended: after the fix.
1 · After the fix2 · Submit now
1
Done: submit after the Hebrew fix. Store date Nov 5; Omer and Noa told.
Undountil Fri 18:00
18:00 Quiet day. The beta moved 3 %, nothing breached.
Message Lucid Total
32 · A day in Lucid Chat. The system as a verified contact in Lucid Chat (Lucid Chat's bubbles, lightly): the morning line and a rendered Horizon cut-out as an image card; a fork as a message with numbered reply pills and the cost-and-toil line first; the reply "1"; the confirmation with Undo until the reversible-until mark; the quiet evening line. Focal subject: the fork and its reply.needs-you 1 · text 1 · numbers 18UC-T1UC-C315§215§5
From: Lucid Total <decide+st-71@belucid.chat> · To: YossiStore submission: go or hold?
iOSbuild 7 · TestFlight
Hebrew screen wraps
Cost: $0 · Toil: 2 h of NoaBuild 7 passes everything but the Hebrew consent screen. Apple has rejected right-to-left faults twice before.Recommended: 1
Reply with one line:
1     After the Hebrew fix (store Nov 5)
2     Submit now
later Ask me tomorrow
This reply is signed for you and this decision; it expires Fri 18:00. Irreversible choices open the app.
# beta-engSlack · Lucid Total is a member
N
Noa 10:12I'll get the release-path tests green by Thursday.
Lucid Total 10:12Only visible to youI heard a commitment: release-path tests green by Thursday.
Make it a taskNot now
O
Omer 10:20When does the store build go out?
Lucid Total 10:20After the Hebrew fix, Nov 5. Yossi chose it this morning.Decision ST-71P1-C-06
Lucid Total 18:00Today in beta-eng: 4 items moved, the Relay road opened, nothing breached.
33 · Email and Slack. Left: a decision email with one visual, the reply-to-decide block and the signed-token note. Right: the agent as a member of a Slack channel: a commitment heard and proposed back only to the speaker; a question answered with citations; the quiet daily line. Focal subject: the reply-to-decide block.needs-you 2 · text 2 · numbers 19UC-T2UC-T315§2.315§5.1

H · Phone

The phone is its own surface: one place or one decision at a time, full-bleed, hold to confirm and hold to talk.

9:41
Good morning, Yossi
The coordinator needs the Railway token
Seal and sendTonight
DDana: does the consent screen match?
It matchesComment
Store submission: go or hold?
After the fixSee the paths
and 2 more
Private beta
Gate 1 Alpha
Europe ready
Engineering
Marketing
Compliance
Product
Support
34 · Phone Horizon. The phone's home: the first card full width with the next two peeking; the goals as a ring row on the horizon line; the places as a strip of tiles (landmark in its disc, ring, heat behind Engineering); the dock with Talk in the middle. Focal subject: the first card.needs-you 3 · text 4 · numbers 2UC-A1UC-Q813§10
9:41
Engineering58 % · forecast week 25
Private beta
iOS 1.0
EU residency
Evals
Changed this week
iOSbuild 7 · TestFlight
WaitsRelease tests wait for the Railway tokenStore waits for the Hebrew fixEU residency waits for the DPA
35 · Phone place: Engineering. One place at a time, full-bleed: its landmark header with the ring; programs as tiles with rings; the facade gallery of what changed (it scrolls sideways); waits as three short lines; the breadcrumb as one chip. Focal subject: Engineering's programs.needs-you 0 · text 1 · numbers 3UC-A2UC-Q213§10
9:41
Consent screen, EU notice
MockDana
EU users see what we keep and why.
Matches the mock in both languages; legal approves.
4/6The Continue button wraps in Hebrew.
9:41
Cost: $0 · Toil: 2 h of NoaStore submission: go or hold?Build 7 passes everything but the Hebrew consent screen.
iOSbuild 7 · TestFlight
Hebrew screen wraps
After the Hebrew fix
Nov 3Nov 5
Omer 1 h · Noa 2 h82 % confidence
Submit now
Nov 3
Review may reject it55 % confidence
Hold to choose
36 · Phone product view and Fork. Left: the product view with the slider between Dana's mock and her screenshot, the goal and done rule, the criteria ring. Right: the Fork as one screen, the visual and two sentences, the paths as swipeable panels (the lit one first), and hold to confirm. Focal subject: the slider; the lit path.needs-you 1 · text 3 · numbers 10UC-R1UC-Q313§10
9:41
Refocus · Europe
ComplianceDec 15 → Dec 1
Engineeringweek 25 → 25
MarketingNov 20 → Dec 4
Productno change
23 items gain priority2 people over capacityMarketing waits 2 more weeks
9:41
where are we on the beta?
The beta slips a week unless the Railway token lands today.
Release tests wait for the tokenStore waits for the Hebrew fixOpen the envelope task
Listening · release to send
37 · Phone Refocus and Talk. Left: Refocus as sliders per place, the world cut-out re-forecasting in the header, the transparency strip as three lines. Right: hold-to-talk, the spoken question shown, and the composed answer sized for the phone. Focal subject: the sliders; the composed answer.needs-you 0 · text 0 · numbers 9UC-R2UC-T413§10

I · Variants and legend

Right to left, high contrast, the list equivalent, and the reference sheet of the mark, the landmarks and the grammar.

בטא פרטית
iOS 1.0
שהות נתונים באירופה
הערכות
פלטפורמה
N
ממשיך לרגולציה · 7
מנהל טכנולוגיה
Partnerships
Engineering
Marketing
Operations
People
Support
System
Good morning, Yossi
Store submission: go or hold?
After the fixSee the paths
DDana: does the consent screen match?
It matchesComment
The coordinator needs the Railway token
Seal and sendTonight
Since yesterday14 buildings lit2 roads opened1 front grew over Compliance
Private beta
Gate 1 Alpha
Europe ready
38 · RTL and high contrast. Top: Engineering in Hebrew (Heebo), the world mirrored, the "continues" chevron pointing to the start, numbers kept left to right; landmarks and marks are not mirrored. Bottom: the Horizon in Deep Blue high contrast: flat ground, landmarks and rings in one ink, visible edges, no glow and no blur. Both keep their own direction and contrast whatever the lab bar says. Focal subject: the mirrored programs; the three cards.needs-you 3 · text 4 · numbers 4UC-Q213§11
Leadership
Product
Design
Compliance
Finance
Partnerships
Engineering
Marketing
Operations
People
Support
System
Back to the mapThe world as a list
Engineering58 % done
Private beta58 % donedecision
Spoken for the focused row“Private beta, in Engineering. 58 percent done, forecast one week late. One decision waiting. Three of four streams moving.”Arrows move · Enter opens · Escape goes up · L layers
39 · The world as a tree. The list equivalent of the map (role=tree): the same hierarchy, landmarks as 16 px glyphs, progress as words, decisions and risks as glyph and word; the focused row and what a screen reader says for it; keys. Focal subject: the focused row: Private beta.needs-you 0 · text 1 · numbers 18UC-A113§1103§9
Lucid TotalThe mark: Lucid's ribbon and its twin, closed into one loop. The AI is drawn with the Lucid mark .
Lucid TotalDeep Blue
Lucid TotalAqua Dusk
Lucid TotalSky Glass
Landmarks · on the three grounds and in one ink
SkylineWorkshopLoomHarbourBridgeLighthouseVaultGreenhouseGearsSummitBeaconRocketFlaskScrollTowerSatelliteStallKeepGate
The world's vocabulary
Ring
Light
Heat
Weather
Flag
Road
Barrier
Facade
Expected
Embassy
Ghost
Haze
N
Presence
The component library · people click, type or speak; the AI composes every view from it
WorldMeasureCompareTimePeopleProductNarrativeActionControlsLayoutsImages · generated imagesgrows: proposed, built, reviewed, installed
40 · Brand, landmarks, grammar. The Lucid Total mark (v0.1) at five sizes on each ground; the nineteen landmarks on Deep Blue, on Sky Glass and in one ink; the vocabulary of the world; the component library. People never assemble or arrange the interface: they click, type or speak, and the AI composes every view from this library. The library grows over time (controls, layouts, visualisation mechanisms, and images and generated images as a family of their own): a missing component is proposed, built, reviewed in every theme and direction, and installed. Focal subject: the reference sheet.needs-you 0 · text 4 · numbers 013§513§8.2